A blog about things that interest me, politics, news, media, architecture, development, environment, local history, secularism, web, dublin ireland, tara
Wednesday, 26 October 2011
% of Expenditure Limit vs % of Vote 2011 Irish General Election
View fully on Tableau Public
2011 election expenditure - SIPO
Dept of Environment Voting documents
Displayed as percentage of spending limit and percentage of vote to normalize for the different sized constituencies.
* 3 seat constituency - €30,150.00
* 4 seat constituency - €37,650.00
* 5 seat constituency - €45,200.00
2011 Election guidelines from Standards in Public Office Commission.
Google Spreadsheet data
2011 Election results on wikipedia
In the spreadsheet I have the data on the public and party funding, and the percentage that makes up of the candidates expenses just looking for a good way to show that.
Also need a better way to show the average e16,790 spend by candidates.
A 2011 candidates donations and costs
Posted by
dublinstreams
at
02:44
0
comments
Labels: 2011, candidates, election, general, Irish, party, percentchart, public, sipo, spending, tableau Public, votes
Saturday, 5 February 2011
% of Expenditure Limit vs % of Vote 2007 Irish General Election
2007 election expenditure - SIPO
Displayed as percentage of spending limit and percentage of vote to normalise for the different sized constituencies.
* 3 seat constituency - €30,150.00
* 4 seat constituency - €37,650.00
* 5 seat constituency - €45,200.00
2007 Election guidelines from Standards in Public Office Commission.
2007 Election results on wikipedia
| Elected | Not Elected | All | All £ | Avg £ of Elected | Avg £ of Not Elected | Avg £ of All | |
| Votes Avg | 16.84% | 4.86% | 9.19% | ||||
| Spending Avg | 60.1% | 36.64% | 45.4% | 13,707 | 22,245 | 13,664 | 16,790 |
In the spreadsheet I have the data on the public and party funding, and the percentage that makes up of the candidates expenses just looking for a good way to show that.
Also need a better way to show the average e16,790 spend by candidates.
A 2011 candidates donations and costs
Posted by
dublinstreams
at
11:16
2
comments
Labels: 2007, candidates, election, general, Irish, party, percentchart, public, sipo, spending, tableau Public, votes
Thursday, 8 May 2008
Arrogant Government archaeologists treat public like they are stupid
In an previous blog post I complained how a digital reconstruction of the Lismullin henge at Tara, the site of which was being controversially destroyed for the construction of the M3 Motorway, was being withheld because...
Virtual images will not be made publicly available for the moment as the high quality of the computer generated images may lead to misconceptions as to what actually exists at Lismullin.Well here are the images.
dept of Arts Heritage and Gaeltacht- National Monuments Publications
Wow.
Its clear the images were withheld because it would have given a visual aid, strengthening the case by the activist that the Tara valley was full of ancient sites, and whether or not much remained of the upstanding structures at this henge in a hollow showed how it was the landscape itself that was important and that should be preserved along with the central monument at Tara.
In June 2007 John Gormley told the Dáil he would release the file in the near future "to ensure the highest levels of transparency and accountability".. The reconstruction were first made in mid 2007 nits now mid 2008, so Gormley's idea of transparency is release vital images a year late. The massive site with the post holes marked in the foregound.
A description
The site is a large (c.80m diameter) circular enclosure formed of a double row or ring of stakeholes. The two rows are 2m apart. The stakeholes are small in diameter (c.10-15cm) and evenly spaced (c.60cm apart) perhaps suggesting post and wattle construction. The enclosure appears to have an entrance in the east. A smaller enclosure c.16m in diameter formed of similarly closely spaced postholes (c.25cm diameter) is positioned centrally within the large enclosure. There are two radial rows of postholes forming a corridor between the entrance of the outer and inner enclosures. In addition there are what appear to be two slot trenches between the end of the corridor and the entrance of the inner enclosureThe enclosure is situated at the centre of a natural geomorphological hollow surrounded by a ridge of higher ground which overlooks all sides of the monument, which in turn is surrounded by lower ground.
Anyway the last camp has been evicted from the area Tara Vigil Camp Being Evicted with some violence by the private security construction company and police. Further reports from the Tara Pixie.
More info on Lismullin.
Delicate site destroyed when NRA archaeologist removed all the top soil off it
M3/NRA reports. Inlcuding photos of the site before during processing(pdf). and Full report on Lismullin excavations with line drawings(pdf)(html copy)
Dept of Environment releases on Lismullin etc
It doesn't seem like(to my amateur eyes) they used a height map to show Lismullin's position in the hollow of the landscape does it?
Article on Lismullin by Joe Fenwick
On the Significance of Lismullin Archaeological Method and Theory and the M3 by Dr Ronald Hicks.
Posted by
dublinstreams
at
22:27
0
comments
Labels: 3d, archaeologists, arrogant, brian duffy, camp, gormley, governement, henge, images, lismullin, M3, meath, motroway, postholes, protectors NRA, public, report, stupid, tara, trasnparency
Thursday, 24 April 2008
New O'Connell Street Development
ETA Photos of the wooden models at archiseek. And views of Moore Street tour I posted about on Archseek, keep following the O'Connell street sorry there.
Finally after years of legal wrangling and speculation and deliberate dereliction of our national main street plans have been revealed of new mall for O'Connell street. 'Dublin Central'
RTE: The plans cover a 5.5-acre area known as Dublin Central which stretches from O'Connell Street to Moore Street and from Henry Street to Parnell Street.See Irish Times:€1.2bn mall scheme to transform O'Connell Street area and Property Week:€1.25bn Dublin mixed-use scheme planned for details.
Another Irish Times article: €180m spent assembling 'Dublin Central' site describes how they want about buying all the building on face and behind O'Connell Street, Henry Street, Moore Street and Parnell Street.
Chartered Land are the developers who built the new Dundrum Town Centre, the refurbished Ilac Centre and Grand Canal Square and South King Centre.
Malls in Blue
Heres a Google Earth Version and a Googlemaps version. You download the Googleearth Version or view it in
Googlemaps and save it to your 'mymaps' and collaborate and add info.
And a microsoft live maps birdeye view to
to follow the walking routes through the proposed development of the streets behind O'Connell street.
Where would be without Architecture Ireland site. It has details of the Arnotts Northern Quarter development and new streets and there are also details of the Original Arnotts buildings. HKR Architects are the site developers for the 'Northern Quarter'.
Somebody has created an interesting tour of Moore street. Here's how it looks in live maps with bird's eye view.
See it in googlemaps
I can't find where you enter the kml's address so I just add it to the url in the address bar after "http://maps.live.com/?mapurl="
More Google Sketchup Buildings for Dublin
I was looking for 3D Google Sketchup buildings for Dublin I had remembered that a few were made years, but was always surprised with google having its EU headquarters here that there is not more google things for Dublin, but I found the old collection of buildings but I also found new one been worked on currently under the Dublin google Sketchup collection.I know there a good mock up of Dublin in second life, and I've seen part of Dublin recreated in 3D in an old TCD graphics department and there are plans to do a new dynamic one, but apart from laziness I figure that I never really attempted to add my own because like the TCD projects its already been done somewhere its just not put up on google.
An outfit called Inshore surveys have as part of business demo show a number of well made models of dublin buildings. and also a animated preview of windmills in Sligo
Also partially complete Dublin Airport